The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PERENCANAAN SEQUENCE PENAMBANGAN BATUBARA UNTUK MENCAPAI TARGET PRODUKSI 2.500.000 TON BATUBARA DI PT. GOLDEN GREAT BORNEO LAHAT SUMATERA SELATAN TAHUN 2021
Bookmark Share

Skripsi

ANALISIS PERENCANAAN SEQUENCE PENAMBANGAN BATUBARA UNTUK MENCAPAI TARGET PRODUKSI 2.500.000 TON BATUBARA DI PT. GOLDEN GREAT BORNEO LAHAT SUMATERA SELATAN TAHUN 2021

Ammar, Kms. Muhammad - Personal Name;

PT. Golden Great Borneo terletak di Kabupaten Lahat, Provinsi Sumatera Selatan. PT. Golden Great Borneo telah menambang batu bara dengan batas stripping ratio 2,5 hingga 2020 dengan target produksi 1,170.000 ton. PT. Golden Great Borneo berencana meningkatkan target produksi pada 2021 menjadi 2,5 juta ton. Sehingga perlu direncanakan urutan desain penambangan baru untuk mencapai target produksi. Penelitian ini bertujuan untuk merencanakan urutan penambangan yang meliputi desain pit dan pembuangan penambangan serta analisis kebutuhan peralatan bongkar muat. sequence Penambangan ini dirancang dengan bantuan software Minescape 5.7 yang kemudian menjadi dasar untuk membuat desain pit dan disposal kemudian menganalisa kebutuhan peralatan bongkar muat yang akan mendukung desain pit dan disposal yang telah dibuat. penjadwalan manual dengan pemilihan blok penambangan secara trial and error dan dievaluasi guna mendapatkan produksi batubara dengan nilai stripping ratio yang telah ditetapkan perusahaan yaitu dengan batasan SR 2.5. Dalam desain pit, dibagi menjadi beberapa blok 50 mx 50 m dengan nama blok strip untuk memudahkan pemantauan lokasi desain urutan. Rancangan Urutan Penambangan direncanakan menjadi empat sekuens yang mampu mendukung target produksi batubara 2.500.000 ton, sekuen penambangan dimulai dari low wall hingga high wall dan luas pembukaan 37,02 Ha. Disain sekuen pembuangan direncanakan untuk inpit dump di area void 4 dengan luas bukaan 26,42 Ha yang mampu menampung overburden sebesar 4.885.735,57 BCM. Dengan kombinasi armada dan pengangkut di setiap triwulan sebagai berikut, Kuartal 1 berjumlah 2 armada penambangan, 10 pengangkut dan 1 armada pengupasan lapisan penutup, 4 unit pengangkut. Kuartal Kedua total 3 armada penambangan, 15 pengangkut dan 2 armada pengupasan lapisan penutup, 7 pengangkut. Kuartal 3 total 3 armada penambangan, 15 armada pengangkut dan 3 armada pengupasan lapisan penutup, 10 pengangkut. Kuartal 4 total 3 armada, penambangan 15 unit hauler dan 3 armada pengupasan lapisan tanah penutup 10 unit hauler.


Availability
#
Central Library (REFERENCES) T526552021
T52655
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T526552021
Publisher
Inderalaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2021
Collation
vii, 97 hlm,: tab,: ilus,: 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.017
Content Type
-
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Penambangan batubara
Specific Detail Info
-
Statement of Responsibility
RIZAL
Other version/related
TitleEditionLanguage
PERENCANAAN SEQUENCE PENAMBANGAN SHORT TERM BULAN JANUARI TAHUN 2024 DI PT. BINA SARANA SUKSES SITE MAS, KABUPATEN LAHAT, SUMATERA SELATAN-id
PERENCANAAN SEQUENCE PENAMBANGAN BATUBARA TRIWULAN I PIT 2 BANKO BARAT PT BUKIT ASAM, TBK TANJUNG ENIM SUMATERA SELATANid
PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN BATUBARA DAN SEQUENCE PENGUPASAN SERTA PENIMBUNAN OVERBUDEN PT SATRIA MAYANGKARA SEJAHTERA JOBSITE PT SRIWIJAYA BANGKIT ENERGY, LAHAT, SUMATERA SELATAN, TAHUN 2021id
PERENCANAAN PENAMBANGAN BATUBARA DAN DISPOSAL OVERBUDEN DALAM MENCAPAI TARGET PRODUKSI PADA TAHUN 2021 DI PIT LDA, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATANid
RANCANGAN SEQUENCCE PENAMBANGAN UNTUK MEMENUHI TARGET PRODUKSI 600.000 TON BATUBARA DI PIT 2 PT LAHAT PULAU PINANG BARA JAYA, KABUPATEN LAHAT, SUMATERA SELATANid
File Attachment
  • Mengambil data. Tunggu beberapa detik dan cobalah memotong atau menyalin lagi.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?