PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN BATUBARA DENGAN TARGET 750.000 TON PADA PIT EAGLE TRIWULAN (II, III, IV) TAHUN 2024 DI PT TRIARYANI, KABUPATEN MURATARA, SUMATERA SELATAN
PT Triaryani is a company engaged in mining, which is located in North Musirawas Regency, South Sumatra Province. The area of Mining Business License (IUP) owned by Pt. Triaryani is 2134 ha. PT Triaryani experienced a target non achievement in the first quarter of 2024. so it is necessary to re-plan in order to support the achievement of production in 2024. Planning the mining sequence in the pit and disposal is carried out in Minescape 5.7 software. After obtaining the appropriate sequence design, proceed with designing the need for excavation and transportation equipment. Quarter 2 as much as 1,102,676.00 bcm of overburden with 270,016.00 tons of coal SR 4.08 with 5 loader units and 26 hauler units. Quarter 3 as much as 1,129,388.00 bcm of overburden with total coal of 286,272.00 tons of SR 3.95 with 5 units of loaders and 28 units of haulers. Quarter 4 as much as 1,129,388.00 bcm of overburden with a total of 286,272.00 tons of SR 3.95 coal with 4 units of loaders and 27 units of haulers. The disposal design in 2024 can accommodate 3,156,112.08 bcm. In the second quarter the disposal can accommodate 1,132,389.43 bcm with an area of 32.88 Ha. In the third quarter the disposal can accommodate as much as 1,204,389.43 bcm with an area of 56.83 Ha. In the fourth quarter the disposals
No other version available