The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN BATUBARA DENGAN TARGET 750.000 TON PADA PIT EAGLE TRIWULAN (II, III, IV) TAHUN 2024 DI PT TRIARYANI, KABUPATEN MURATARA, SUMATERA SELATAN
Bookmark Share

Skripsi

PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN BATUBARA DENGAN TARGET 750.000 TON PADA PIT EAGLE TRIWULAN (II, III, IV) TAHUN 2024 DI PT TRIARYANI, KABUPATEN MURATARA, SUMATERA SELATAN

Anderson, Markus Yon - Personal Name;

PT Triaryani is a company engaged in mining, which is located in North Musirawas Regency, South Sumatra Province. The area of Mining Business License (IUP) owned by Pt. Triaryani is 2134 ha. PT Triaryani experienced a target non achievement in the first quarter of 2024. so it is necessary to re-plan in order to support the achievement of production in 2024. Planning the mining sequence in the pit and disposal is carried out in Minescape 5.7 software. After obtaining the appropriate sequence design, proceed with designing the need for excavation and transportation equipment. Quarter 2 as much as 1,102,676.00 bcm of overburden with 270,016.00 tons of coal SR 4.08 with 5 loader units and 26 hauler units. Quarter 3 as much as 1,129,388.00 bcm of overburden with total coal of 286,272.00 tons of SR 3.95 with 5 units of loaders and 28 units of haulers. Quarter 4 as much as 1,129,388.00 bcm of overburden with a total of 286,272.00 tons of SR 3.95 coal with 4 units of loaders and 27 units of haulers. The disposal design in 2024 can accommodate 3,156,112.08 bcm. In the second quarter the disposal can accommodate 1,132,389.43 bcm with an area of 32.88 Ha. In the third quarter the disposal can accommodate as much as 1,204,389.43 bcm with an area of 56.83 Ha. In the fourth quarter the disposals


Availability
#
Central Library (REFERENCE) T1607652024
T160765
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1607652024
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xv, 32 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.330 7
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Batubara – Penambangan
Specific Detail Info
-
Statement of Responsibility
TUTI
Other version/related

No other version available

File Attachment
  • PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN BATUBARA DENGAN TARGET 750.000 TON PADA PIT EAGLE TRIWULAN (II, III, IV) TAHUN 2024 DI PT TRIARYANI, KABUPATEN MURATARA, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?