The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN DAN PENJADWALAN PENAMBANGAN AREA SHARING WALL DIANTARA DUA IUP DALAM RANGKA KONSERVASI CADANGAN BATUBARA, MUSI RAWAS UTARA, SUMATERA SELATAN
Bookmark Share

Skripsi

PERENCANAAN DAN PENJADWALAN PENAMBANGAN AREA SHARING WALL DIANTARA DUA IUP DALAM RANGKA KONSERVASI CADANGAN BATUBARA, MUSI RAWAS UTARA, SUMATERA SELATAN

Sinaga, Guntur Lintang - Personal Name;

PT Gorby Putra Utama is a company engaged in the coal mining industry. The current problem experienced by PT Gorby Putra Utama is that it is not possible to maximize coal mining in the sidewall area in the GE pit, because the GE pit sidewall area is directly adjacent to the IUP of PT Banyan Koalindo Lestari, so it is necessary to carry out reserve conservation activities in the area. The chosen reserve conservation measure is a wall sharing cooperation between PT Gorby Putra Utama and PT Banyan Koalindo Lestari. Based on the reserve results using minescape 5.7 software, it is known that the coal reserves in the sharing wall area are 4,818,801 tons and the total overburden that must be stripped is 20,013,681 bcm with a mining stripping ratio of 4.1. the mining life of the sharing wall area is 2 years and 240 days with a mining design sequence of 6 semesters. The mining scheduling of the sharing wall area is designed based on the fleet that has been dedicated to the sharing wall area in accordance with the agreement of both parties, namely 2 fleets for coal mining and 5 fleets for oveburden mining. The excavation equipment used for coal mining is Sumitomo SH490 and for overburden stripping is Sany Sy 365. The disposal design has 2 areas, namely for the GE pit area with a capacity of 13,192,236 m3 and for the BKL pit area with a capacity of 10,995,575 m3.


Availability
#
Central Library (REFERENCE) T1607622024
T160762
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1607622024
Publisher
Indrlaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xvi, 84 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.330 7
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Pertambangan batubara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
TUTI
Other version/related

No other version available

File Attachment
  • PERENCANAAN DAN PENJADWALAN PENAMBANGAN AREA SHARING WALL DIANTARA DUA IUP DALAM RANGKA KONSERVASI CADANGAN BATUBARA, MUSI RAWAS UTARA, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?