Image of TECHNICAL PLANNING FOR COAL MINING SEQUENCE IN 2024 WITH CONSTRAINT OF GEOTECHNICAL LOWWALL AREAS AND DISPUTED LAND PROBLEM AT PT XYZ
Bookmark Share

Text

TECHNICAL PLANNING FOR COAL MINING SEQUENCE IN 2024 WITH CONSTRAINT OF GEOTECHNICAL LOWWALL AREAS AND DISPUTED LAND PROBLEM AT PT XYZ

Muhakka, Athuur Mukti - Personal Name;

PT XYZ targets 4,243,000 bcm of overburden and 1,150,000 tons of coal in 2024. The actual mining process in the first quarter was carried out and obtained overburden production of 577,698 bcm and 136,079 tons of coal which were under the company's first-quarter plan due to geotechnical problems and the presence of issues regarding disputed land. A mine plan is carried out by calculating the unit capacity first and modelling a mining simulation based on existing constraints in the field using Spry software to estimate when these issues must be resolved to meet the company's annual production target. Planning is carried out for quarter 2, quarter 3, and quarter 4 using the mining situation at the end of March. The pit redrawing process was carried out after obtaining the contour of the mining plan using Minecraft software and obtaining reserves estimates based on the pit in the second quarter of 1,113,735 bcm of overburden and 256,719 tons of coal with SR 4.33 using 5 Excavator fleets with 26 trucks. In the third quarter, production estimates based on the pit were obtained at 1,385,514. bcm overburden and 366,277 tons of coal with SR 3.78 using 6 Excavator fleets and 36 trucks, and in the fourth quarter we obtained 1,233,967 bcm overburden and 467,080 tons of coal with SR 2.65 using 6 fleets and 40 trucks. Based on the total planned production for the 2nd quarter, 3rd quarter and 4th quarter, added with the actual production for the 1st quarter, the total production was 4,312,916 bcm of overburden and 1,224,156 tons of coal, which has met the company's target with a deviation of more than 1.6% from the overburden target and 6% towards the company's annual coal target.


Availability
#
Central Library (References) T1563812024
T156381
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1563812024
Publisher
Indralaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2024
Collation
xv, 61 hlm.; ilus.; tab, 29 cm
Language
English
ISBN/ISSN
-
Classification
622.307
Content Type
Text
Media Type
unmediated
Carrier Type
other (computer)
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Jenis Pertambangan Tertentu
Specific Detail Info
-
Statement of Responsibility
SEW
Other version/related

No other version available

File Attachment
  • TECHNICAL PLANNING FOR COAL MINING SEQUENCE IN 2024 WITH CONSTRAINT OF GEOTECHNICAL LOWWALL AREAS AND DISPUTED LAND PROBLEM AT PT XYZ
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?