ANALISIS BIAYA RENCANA REKLAMASI PERHEKTAR DI PT GENTALA BUMI NUSANTARA JOB SITE PT UNGGUL NUSANTARA KABUPATEN BARITO UTARA KALIMANTAN TENGAH
Based on the Decree of the Minister of Energy and Mineral Resources of the Republic of Indonesia Number 1827 K/30 / MEM / 2018 concerning Guidelines for the Implementation of Reclamation and Post-mining and Post-operation in Mineral and Coal Mining Business Activities requires mining companies to carry out reclamation and post-mining activities on the mining area being cultivated, as a guarantee for mining entrepreneurs to carry out reclamation, these entrepreneurs are required to submit a sum of money as a reclamation guarantee, which must be placed before the company carries out production operations. Therefore, PT Unggul Nusantara calculates the reclamation plan, but the increase in actual reclamation costs underlies this research. Before data processing is carried out, it is necessary to know the productivity of the digging and loading equipment and the number of plants. With the resulting productivity and number of plants. Then calculate the costs incurred from tools and plants for reclamation activities. The data obtained is then analyzed to produce recommendations in the form of suggestions that are relevant to the problems to be analyzed. The data obtained is analyzed so that it can be known that reclamation activities can be carried out. After the research is carried out, the technical implementation of reclamation activities includes land stewardship plans, revegetation activity plans and plant maintenance
No other version available