The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI AVAILABILITY AND UTILIZATION PERALATAN PEMUATAN OVERBURDEN PADA BULAN FEBRUARI 2025 DI LOKASI PIT LS PT TATA BARA UTAMA SUMATERA SELATAN
Bookmark Share

Skripsi

EVALUASI AVAILABILITY AND UTILIZATION PERALATAN PEMUATAN OVERBURDEN PADA BULAN FEBRUARI 2025 DI LOKASI PIT LS PT TATA BARA UTAMA SUMATERA SELATAN

Putra, Akbar Yuvi Dwi - Personal Name;

Excavators are one of the main loading equipment used in overburden mining activities. The effectiveness of excavator operations is influenced by the level of Physical Availability (PA), with a minimum standard of 90% according to KEPMEN ESDM No. 1827 K/30/MEM/2018. However, in practice, this standard is often not achieved. This study was conducted at Pit LS, PT Tata Bara Utama, in February 2025 to determine the values of physical availability, mechanical availability, and effective working hours, as well as to evaluate and compare the performance of each excavator unit. The research methods included field orientation, collection of primary and secondary data, and data processing using Microsoft Excel. The analyzed parameters consisted of Physical Availability (PA), Mechanical Availability (MA), Usage Availability (UA), and Effective Utilization (EU). The results show that Caterpillar EX-2015 (2 years old) and EX-2052 (1 year old) had high PA values of 95.11% and 97,67%, with MA values of 93,77 % and 97 %. In contrast, Kobelco EX-5061 and EX-5063 (4 years old) only had PA values of 54,76 % and 38.95%, with MA values of 48,78% and 31,86%. These low values were caused by high repair hours (304 hours and 410.2 hours), which resulted in effective working hours of 289,6 and 191,8 hours, far below the targets of 534,2 and 541,8 hours. This indicates a relationship between equipment age and the decline of mechanical condition, which directly affects physical availability and operational effectiveness.


Availability
#
Central Library (Reference) T1893312025
T189331
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1893312025
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Pertambangan dan Geologi Fakultas Teknik Universitas Sriwijaya., 2025
Collation
xvi, 130 hlm.; ilus.; tab, 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
621.862 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Peralatan Pemuatan dan Penggalian
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • EVALUASI AVAILABILITY AND UTILIZATION PERALATAN PEMUATAN OVERBURDEN PADA BULAN FEBRUARI 2025 DI LOKASI PIT LS PT TATA BARA UTAMA SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?