Image of ANALISA PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE FAST TRACK PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG
Bookmark Share

Skripsi

ANALISA PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE FAST TRACK PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG

Adillyah, Putri - Personal Name;

Construction projects are prone to delays due to limitations in time, cost, and resources. Therefore, effective project management is required. Conventional scheduling methods such as the S-Curve and Bar Chart, which are commonly used in Indonesia, have limitations in project monitoring, so that an alternative acceleration is needed through the Fast Track method. This research was conducted at the Gelumbang Flyover Construction Project which is at risk of delay as the project has previously experienced a stalled condition. The analysis was carried out using the Precedence Diagram Method (PDM) with the support of Microsoft Project by identifying the critical path and applying overlapping work to critical activities in accordance with Fast Track provisions. The results showed that the application of the Fast Track method was able to accelerate the project duration by 16 days or approximately 4,4% of the planned duration and resulted in indirect cost savings of Rp.207.579.695,552 or 0,222% of the initial contract. Keywords: Project Management, Fast Track, PDM, Microsoft Project


Availability
#
Central Library (REFERENCE) T1920712026
T192071
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1920712026
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2026
Collation
xviii, 151 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
624.207
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Manajemen Proyek Konstruksi
Prodi Teknik Sipil dan Perencanaan
Specific Detail Info
-
Statement of Responsibility
TUTI
Other version/related

No other version available

File Attachment
  • ANALISA PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE FAST TRACK PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?