ANALISIS PENGARUH GEOMETRI JALAN ANGKUT TERHADAP PENCAPAIAN TARGET PRODUKSI BATU KAPUR PADA JALUR FRONT B–LIMESTONE CRUSHER VI DI PT SEMEN PADANG
Limestone hauling activities at PT Semen Padang are affected by the haul road geometry from Front B to Limestone Crusher VI. This study aims to analyze haul road geometry, calculate cycle time and hauling equipment productivity, and provide improvement recommendations to increase the production achievement of Front B toward the estimated monthly target. The parameters analyzed using ArcMap 10.8 include road length, road width, grade, cross fall, and superelevation. The results show that the haul road length from Front B to Limestone Crusher VI is 1,083.22 m, with an estimated Front B production target of 216,671.40 tons/month based on the hauling distance approach. The actual condition results in a cycle time of 1,140.00 seconds, productivity of 93.40 tons/hour, and production of 5 hauling units of 6,005.6 tons/day or 186,173.6 tons/month, achieving 85.92% of the estimated target. The improvement recommendations include widening curve sections, reducing grade, improving cross fall, and increasing superelevation. After the recommendations, the estimated cycle time decreases to 989.39 seconds, productivity increases to 107.62 tons/hour, and production increases to 6,919.95 tons/day or 214,518.45 tons/month, achieving 99% of the estimated target. Therefore, haul road geometry improvement can reduce cycle time, increase productivity, and bring Front B production closer to the estimated monthly production target.
No other version available