Image of EVALUASI DIMENSI SUMP DAN KAPASITAS POMPA PADA SISTEM PENYALIRAN TAMBANG TERBUKA DI PIT 3 PT. DIZAMATRA POWERINDO, LAHAT, SUMATERA SELATAN
Bookmark Share

Skripsi

EVALUASI DIMENSI SUMP DAN KAPASITAS POMPA PADA SISTEM PENYALIRAN TAMBANG TERBUKA DI PIT 3 PT. DIZAMATRA POWERINDO, LAHAT, SUMATERA SELATAN

Vitora, M. Rafli - Personal Name;

The application of the strip mine method at PT Dizamatra Powerindo altered the topography into a massive basin that functions as a catchment area, causing rainwater to flow directly and accumulate in the mine opening area. The DP pit 3 area is currently a void (mine lake) filled with water and mud, which is planned to be re-mined. The research method uses a quantitative approach through direct field observation, focusing on evaluating the sump dimensions and pumping system. The results of rainfall analysis using the Gumbel method obtained a planned rainfall of 779.07 mm/month or 25.13 mm/day, and a rainfall intensity of 2.71 mm/hour with a 10-year rainfall return period. A catchment area of 55 Ha produces a runoff discharge of 1,340.58 m³/hour or 7,744.56 m³/day. The measured average groundwater discharge is 26.87 m³/hour or 644.90 m³/day, so the total water inflow reaches 8,389.46 m³/day. The actual sump condition with a volume of 55,871.47 m³ has an irregular shape due to damage and its base is covered by mud deposits. The use of 1 unit of Multiflo 420EX pump produces an actual outflow of 647.65 m³/hour, which is currently applied merely to control the inundation water level. Based on calculations and field conditions, the ideal sump plan is designed according to the technical guidelines of Kepmen ESDM No. 1827 K/30/MEM/2018. The recommended sump dimensions are designed with a depth of 5 meters, resulting in a storage volume of 36,850.00 m³. The pumping plan shows a pump ratio of 1.24, indicating that this pumping system is quite effective in balancing the water inflow rate. Thus, the planned re-mining activities can be carried out safely.


Availability
#
Central Library (Reference) T2012512026
T201251
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T2012512026
Publisher
Indralaya : Prodi Teknik Pertambangan, Jurusan Pertambangan dan Geologi Fakultas Teknik Universitas Sriwijaya., 2026
Collation
xv, 104 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
622.332 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Pertambangan batubara
Jurusan Pertambangan dan Geologi
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
MI
Other version/related

No other version available

File Attachment
  • EVALUASI DIMENSI SUMP DAN KAPASITAS POMPA PADA SISTEM PENYALIRAN TAMBANG TERBUKA DI PIT 3 PT. DIZAMATRA POWERINDO, LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?