Skripsi
PERENCANAAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) DAN PEMETAAN RUTE ANGKUTAN SAMPAH BERBASIS GIS DI KABUPATEN OKU
TPST (Integrated Waste Processing Facility) is a facility designed to manage waste from multiple sources in an integrated manner through sorting, recycling, composting, and other treatment processes prior to the disposal of residual waste at the Final Disposal Site (TPA). This study aims to quantify waste generation in the selected sub-districts, develop waste transportation route maps using a Geographic Information System (GIS), and determine the optimal location as well as facility requirements for TPST development. The analysis employs a quantitative approach, incorporating population projection methods, land requirement projections, and direct field measurements of waste generation. In addition, spatial analysis is conducted through mapping in QGIS based on existing transportation route data. The outputs of this study include a comparison between actual transported waste volumes and theoretical estimates, spatial mapping of existing waste transportation routes, and estimation of land requirements as a basis for TPST planning. The findings indicate that the volume of waste transported to the TPA is 108.89 m³/day, compared to a theoretical waste generation potential of 376.36 m³/day, resulting in a service coverage level of 28.93%. A total of 12 waste collection vehicles operate across the three studied sub-districts, with the maximum travel distance reaching 98.24 km per trip. The projected TPST development for a 10-year planning horizon requires a total land area of 1.595 hectares and a total building area of 11,105.4 m², accommodating various waste management facilities.
No other version available