KAJIAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PENGUPASAN OVERBURDEN DI PT. BAHANA SELARAS ALAM SITE GORBY PUTRA UTAMA, KABUPATEN MUSI RAWAS UTARA, SUMATERA SELATAN
This study aims to evaluate the productivity of loading and hauling equipment used in overburden removal activities at PT Bahana Selaras Alam Site Gorby Putra Utama, North Musi Rawas Regency, South Sumatra. The equipment used in the overburden stripping operation consists of a Hitachi 350 Excavator as the loading unit and HINO 500 Dump Trucks as the hauling units. The research method involved collecting primary data in the form of loading and hauling equipment cycle times and secondary data including equipment specifications and company operational data. The analysis was carried out by calculating the productivity of the loading equipment, the productivity of the hauling equipment, and the match factor between the two units. The results showed that the productivity of the Hitachi 350 Excavator was 163.83 BCM/hour with an average cycle time of 22.28 seconds, while the productivity of the HINO 500 Dump Truck was 27.16 BCM/hour with an average cycle time of 763.34 seconds. The calculated match factor was 0.58, indicating that the compatibility between loading and hauling equipment was not optimal, causing the excavator to experience waiting time due to the insufficient number of hauling units. Factors affecting productivity include loading patterns, haul road conditions, cycle time, work efficiency, operator skills, material characteristics, and equipment availability. Several efforts can be implemented to improve productivity, including increasing the number of HINO 500 Dump Trucks from 4 units to 7 units, improving haul road geometry, enhancing operator skills through training programs, and conducting regular equipment maintenance.
No other version available