Skripsi
ANALISIS TEKNIS DAN EKONOMIS RENCANA REKLAMASI PERIODE IV DI PT BATU ALAM SELARAS KABUPATEN LAHAT SUMATERA SELATAN
PT Batu Alam Selaras (PT BAS) is a coal mining company in Lahat Regency, South Sumatra Province, which is obligated to implement mine reclamation in accordance with the Decree of the Minister of Energy and Mineral Resources No. 344.K/MB.01/MEM.B/2025. This study aims to analyze the technical and economic aspects of the Period IV reclamation plan (2026–2028) and evaluate its compliance level with the prevailing regulations. The research methodology employs a correlation analysis between theoretical frameworks and secondary field data processed using Microsoft Excel. The technical analysis indicates that the total planned disposal area to be reclaimed is 51.35 ha, broken down into 4.01 ha in 2026, 20.48 ha in 2027, and 26.86 ha in 2028. The total volume of topsoil required for slope grading and vegetation root zones is 207,000 BCM. The topsoil spreading and arrangement operations require a mechanical fleet consisting of 1 unit of Komatsu PC 300 Excavator (productivity of 202.28 BCM/hour) and 3 units of Hino Dutro 130 HD Dump Trucks (combined fleet productivity of 232.14 BCM/hour), with a total operational duration of 955.90 hours. Additionally, 1 unit of D8R Bulldozer (productivity of 628.01 BCM/hour) is required for land leveling with a total working time of 327.07 hours. The revegetation plan will utilize a combination of cover crops namely Javanese mucuna (Calopogonium mucunoides), pioneer trees namely sengon (Albizia chinensis), and local species namely durian (Durio zibethinus). The economic analysis of the reclamation budget is structured based on direct costs (land arrangement, revegetation, and maintenance) and indirect costs (equipment mobilization, engineering design, contractor management, and supervision) in compliance with standardized government guidelines
No other version available