The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PEKERJAAN SEGMENTAL BOX GIRDER PROYEK PEMBANGUNAN JEMBATAN MUSI V
Bookmark Share

Skripsi

ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PEKERJAAN SEGMENTAL BOX GIRDER PROYEK PEMBANGUNAN JEMBATAN MUSI V

Dinata, Anisah Sekar - Personal Name;

The high number of workplace accidents in the construction sector, particularly in bridge construction projects with high structural complexity and large project scale, highlights the importance of conducting occupational health and safety (OHS) risk analysis. This study was conducted on the Musi V Bridge Construction Project involving segmental box girder work using the balance cantilever method, aiming to identify hazard sources, analyze risk levels, and develop risk control recommendations. Data was collected through literature review, preliminary surveys, and questionnaire distribution to 20 respondents. Data were analyzed using the Severity Index (SI) method to assess probability and impact, and the Probability Impact Matrix (PIM) to determine the level of risk. The results identified 68 risk variables across 16 work stages, with 6 classified as high risk and 62 as medium risk. The six high-risk categories include: broken slings during form traveller placement at the assembly process location, workers falling from heights and being struck by falling materials during form traveller installation, workers being hit by broken strands during stressing, workers falling into the river during traveller launching, and workers falling from heights during safety deck removal. Risk control recommendations refer to the hierarchy of risk controls.


Availability
#
Central Library (Reference) T1947242026
T194724
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1947242026
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2026
Collation
xi, 74 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
363.110 7
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Kereta Api
Prodi Teknik Sipil dan Perencanaan
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related
TitleEditionLanguage
PENGARUH KEBIJAKAN KESELAMATAN DAN KESEHATAN KERJA (K3)TERHADAP KINERJA KARYAWAN PT. HUTAMA KARYA (PERSERO) (STUDI KASUS: PROYEK PEMBANGUNAN JALAN TOL RUAS SIMPANG INDRALAYA-MUARA ENIM SEKSI SIMPANG INDRALAYA PRABUMULIH)id
PERLINDUNGAN HUKUM BAGI TENAGA KESEHATAN (NAKES) PADA MASA PANDEMI COVID 19 DALAM PERSPEKTIF KESELAMATAN DAN KESEHATAN KERJAid
File Attachment
  • ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PEKERJAAN SEGMENTAL BOX GIRDER PROYEK PEMBANGUNAN JEMBATAN MUSI V
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?