The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS RISIKO K3 MENGGUNAKAN METODE HIRARC PADA PEKERJAAN DINDING PENAHAN TANAH (STUDI KASUS: JEMBATAN AIR KEMBANG SARI-KABUPATEN PALI)
Bookmark Share

Skripsi

ANALISIS RISIKO K3 MENGGUNAKAN METODE HIRARC PADA PEKERJAAN DINDING PENAHAN TANAH (STUDI KASUS: JEMBATAN AIR KEMBANG SARI-KABUPATEN PALI)

Jailani, Abdul Qodir - Personal Name;

This research was conducted on the retaining wall work (DPT) at the Air Kembang Sari Bridge Replacement Project in PALI Regency, which has a fairly high level of occupational accident risk. This study aims to identify potential hazards, assess the risk level, and determine risk control measures for Occupational Health and Safety (OHS) using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. The data used consist of primary data through field observations, interviews, and questionnaires with 15 respondents, as well as secondary data from project documents. Based on the research results, a total of 27 potential hazards were identified at all stages of the work, from preparation, excavation, foundation work, wall assembly, to finishing. The risk levels obtained are in the medium and high categories, with a dominance in the medium category, especially in excavation work and material assembly such as landslides and being buried by materials, and heavy equipment accidents. Risk control is carried out based on the hierarchy of controls, which includes engineering controls, administrative controls, and the use of personal protective equipment (PPE). It can be concluded that the implementation of the HIRARC method can systematically identify and control risks, thereby improving workplace safety and minimizing the potential for accidents in retaining wall construction work.


Availability
#
Central Library (Reference) T1981252026
T198125
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1981252026
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2026
Collation
xv, 129 hlm.; ilus.; tab.; 29 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
624.068 07
Content Type
Text
Media Type
unmediated
Carrier Type
-
Edition
-
Subject(s)
Manajemen konstruksi
Prodi Teknik Sipil dan Perencanaan
Specific Detail Info
-
Statement of Responsibility
KA
Other version/related
TitleEditionLanguage
PENGELOLAAN SUMBER DAYA MANUSIA PADA MANAJEMEN KONSTRUKSI DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2003 (STUDI KASUS PEMBANGUNAN GEDUNG UTAMA RUMAH SAKIT UMUM PRABUMULIH)id
File Attachment
  • ANALISIS RISIKO K3 MENGGUNAKAN METODE HIRARC PADA PEKERJAAN DINDING PENAHAN TANAH (STUDI KASUS: JEMBATAN AIR KEMBANG SARI-KABUPATEN PALI)
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?