ANALISA PERBANDINGAN ESTIMASI VOLUME DAN BIAYA PEKERJAAN MENGGUNAKAN METODE BUILDING INFORMATION MODELLING (BIM) DAN KONVENSIONAL (STUDI KASUS: PEMBANGUNAN FLYOVER GELUMBANG)
This study discusses the implementation of the Building Information Modelling (BIM) method using Autodesk Revit 2026 in the concrete structural works of the Gelumbang Flyover Construction Project. The study aims to determine the results of structural work volume calculations using the BIM method, compare the work volume results between the BIM and conventional methods, and identify the differences in cost estimation between the two methods. The modelling process was carried out based on the project’s shop drawings by developing a three-dimensional (3D) model and extending it into BIM 5D to obtain the Quantity Take Off (QTO). The structural elements reviewed in this study include lean concrete, borepile, pilecap, abutment, wingwall, U-Girder stopper, diaphragm, approach slab, parapet, sidewalk, and bridge deck slab. The results showed that the total work volume calculated using the BIM method was 3235.344 m³, while the conventional method produced a total volume of 3305.773 m³, resulting in a difference of 70.429 m³ or 2.13%. The largest difference occurred in the wingwall work item, with a discrepancy of 28.86%. The estimated cost obtained using the BIM method was IDR 7,767,527,948.36, while the conventional method resulted in IDR 7,934,031,095.37, with a cost difference of IDR 166,503,147.01 or approximately 2.10%. The findings indicate differences in the level of accuracy in the calculation process, where the BIM method provides more detailed results due to detailed modelling and the automatic volume deduction capability.
No other version available