ANALISA PERCEPATAN DURASI DAN PENGARUH BIAYA PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG
This research is backgrounded by the delay in the Flyover Gelumbang construction project, which recorded a negative deviation of 5.160% in the 37th week. The primary factors hindering work progress include adverse weather conditions and delays in the supply of materials such as granular, mini piles, and selected embankment. This delay caused the remaining work duration to swell to 112 days from the initial plan of 98 days, with potential delay penalties reaching Rp100.000.000 per day. The purpose of this research is to analyze duration acceleration efforts and their impact on costs using the crashing method with the alternative of adding overtime work hours (1 to 4 hours). The analysis focuses on activities in the critical path of the remaining work (week 38 to week 52) using Microsoft Project software and the Time Cost Trade-Off (TCTO) method. The results of the analysis show that each variation of overtime successfully accelerated the project duration but provided different cost impacts. The most efficient and optimal condition was achieved with the application of 3 hours of overtime, where the project duration was successfully shortened to 101 days (duration efficiency 9,82%). This point resulted in a minimum total cost of Rp35.783.530.985,22, providing savings of Rp75.599.824,95 compared to the normal cost. Strategically, this acceleration prevents the contractor from potential delay penalties of Rp1.100.000.000,00 because the project can be completed exactly at the end of the PHO period.
No other version available