The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Login
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISA PERCEPATAN DURASI DAN PENGARUH BIAYA PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG
Bookmark Share

Skripsi

ANALISA PERCEPATAN DURASI DAN PENGARUH BIAYA PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG

Chosyatillah, Intan 03011182 - Personal Name;

This research is backgrounded by the delay in the Flyover Gelumbang construction project, which recorded a negative deviation of 5.160% in the 37th week. The primary factors hindering work progress include adverse weather conditions and delays in the supply of materials such as granular, mini piles, and selected embankment. This delay caused the remaining work duration to swell to 112 days from the initial plan of 98 days, with potential delay penalties reaching Rp100.000.000 per day. The purpose of this research is to analyze duration acceleration efforts and their impact on costs using the crashing method with the alternative of adding overtime work hours (1 to 4 hours). The analysis focuses on activities in the critical path of the remaining work (week 38 to week 52) using Microsoft Project software and the Time Cost Trade-Off (TCTO) method. The results of the analysis show that each variation of overtime successfully accelerated the project duration but provided different cost impacts. The most efficient and optimal condition was achieved with the application of 3 hours of overtime, where the project duration was successfully shortened to 101 days (duration efficiency 9,82%). This point resulted in a minimum total cost of Rp35.783.530.985,22, providing savings of Rp75.599.824,95 compared to the normal cost. Strategically, this acceleration prevents the contractor from potential delay penalties of Rp1.100.000.000,00 because the project can be completed exactly at the end of the PHO period.


Availability
#
Central Library (REFERENCES) T1983472026
T198347
Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1983472026
Publisher
Indralaya : Prodi Teknik Sipil dan Perencanaan, Fakultas Teknik Universitas Sriwijaya., 2026
Collation
xiv, 73 hlm.:ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
624.207
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Sipil dan Perencanaan
Proyek konstruksi jembatan
Specific Detail Info
-
Statement of Responsibility
TUTI
Other version/related

No other version available

File Attachment
  • ANALISA PERCEPATAN DURASI DAN PENGARUH BIAYA PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN FLYOVER GELUMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?