PRA-RANCANGAN PABRIK PEMBUATAN BIODIESEL DARI MINYAK JELANTAH KAPASITAS 106.000 TON/TAHUN
The biodiesel production plant with a production capacity of 106.000 tons/year is planned to be established in 2030 in Bogor Regency, West Java, with a plant area of 33 m². The biodiesel production process refers to Patent WO 2025/052468, in which the process involves an esterification reaction using sulfuric acid (H₂SO₄) and methanol as catalysts, followed by a transesterification reaction using sodium methoxide (CH₃ONa) and methanol in a batch stirred tank reactor. The reactions are carried out at a temperature of 60°C, an agitation speed of 104 rpm, and a processing time of 60 minutes. The plant is organized as a Limited Liability Company (Perseroan Terbatas/PT) with a line-and-staff organizational structure led by a director and supported by 177 employees. The biodiesel plant is considered feasible to be established because it satisfies various economic feasibility parameters as follows: Total Capital Investment (TCI) = US$ 66,992,598.52 Total Production Cost (TPC) = US$ 128,724,574.52 Annual Selling Price (SP) = US$ 180,284,770.89 Annual Cash Flow (ACF) = US$ 31,983,571.44 Pay Out Time (POT) on Investment = 2.03 years Rate of Return (ROR) = 46.95% Discounted Cash Flow Rate of Return (DCF–ROR) = 51.38% Break Even Point (BEP) = 35.75% Service Life = 11 years