High-rise building construction projects have a very high level of risk. Factors such as large work weights and complex building structure designs are the main causes. Risks that occur will have an impact on cost and time aspects, cost and time aspects are the two most impactful aspects in construction projects. It can also cause direct losses for the contractor. Risk can be reduced through a s…
ASCE 7 new code, ASCE 7-16 is adopted in Indonesia to become several building codes namely, SNI 1726:2019 for earthquake loads and its requirements and SNI 1727:2020 for minimum loads on buildings. There is a new requirement that is different from SNI 1727:2013, namely tsunami loads. This load is adopted because of its relevance to Indonesia. This study aims to know the structural response of a…