The average annual load factor exceeding 70% for corridors 1, 3, 6, and 8 from 2023 to 2025 indicates a high public demand for integrated public transportation with the LRT. Route extensions were implemented in corridor 1 (3 km), corridor 3 (465 meters), and corridor 6 (1.03 km). This study aims to analyze user service quality of the Musi Emas feeder based on operational performance compared to…