The Acetic Acid plant, with a production capacity of 50,000 tons per year, is planned to be constructed in 2028 and begin operation in 2030, located in the Guntung area, North Bontang District, Bontang City, East Kalimantan, Indonesia, covering an estimated area of 2.2 hectares. The raw materials used in the production of Acetic Acid are Methanol and Carbon Monoxide. The production process is b…