The well GDG-X has performed hydraulic fracturing stimulation at J 8 t o Fehruary 20, 2014 to increase production, but the result was not as expected so well dishutdown on 07 July 2014. From the observalion stages stimulation stimulation obtained Information that the implementation went smoothly without any obstacles resulting in fractures with a length of 118.1 meters, width of 0.12 inch and h…