PT Triaryani plans to mine coal with a stripping ratio value close to one (1) until the end of mine 2023. So it is necessary to plan for mining design and scheduling per quarter to achieve this planning target. This study aims to plan a mining sequence that includes the capabilities and requirements of loading and unloading equipment, as well as a mining scheduling plan. Mining scheduling begin…