Mining area of PT. Bima Putra Abadi Citranusa consists of 8 Fleet. Planning for work operations in June 2022 for Fleet 1 and Fleet 2 is stripping the overburden. The production targets set to be achieved from Fleet 1 and Fleet 2 are 158,600 bcm and 102,800 bcm, respectively. Therefore, it is necessary to optimize productivity as well as the willingness and use of digging and loading equipment t…