Pond maintenance activities in the settling pond in the PT Kaltim Prima Coal open pit area are an important part of the mine water management system to prevent excessive sedimentation and disruption of mine operations. This study aims to analyze the productivity of heavy equipment used in the work, namely CAT 320 GC long arm backhoe excavator and HINO FM 260 JD dump truck, in Murung and Selanti…