The ideal mine haul road will optimize production results in accordance with the planned production targets. The coal production target at PT Bima Putra Abadi Citranusa is 300,000 tons per month, while the actual production is 237,450 tons per month. One of the reasons for this failure was due to the less than ideal haul road geometry, such as less than ideal road width, too high grade and so o…