Tiga Dihaji Dam is one of the water resources infrastructures that has the potential to experience sedimentation due to river flow carrying sediment materials, which can lead to sediment deposition and reduce the effectiveness of the dam. This study was conducted to analyze bed load transport and to compare the calculation results using several methods. The methods used in this study include Du…
Peat soil is characterized by its exceptionally low bearing capacity and high compressibility, thus requiring soil improvement before being utilized as an infrastructure supporting medium. One of the reinforcement methods that can be applied is the combination of bamboo cerucuk and geosynthetic material in the form of geogrid. This study aims to compare the bearing capacity of peat soil before …
Infrastructure development in Indonesia has undergone a lot of development. This of course also leads to an increase in energy needs in every building. As a solution, a system known as green building was introduced which focuses on resource efficiency and sustainable utilization. One of the criteria that is assessed by green buildings is energy efficiency, which is an effort to reduce the level…
The implementation of the Occupational Health and Safety Management System (SMK3) in construction projects plays an important role in minimizing the risk of workplace accidents, maintaining workers’ health, and supporting the smooth execution of project activities. Data were collected through field observations and questionnaire distribution to 20 respondents who were directly involved in pro…
This study examines the integration of transportation modes and the potential users of the Kertalaya Train among Sriwijaya University students on the Palembang–Indralaya route. The main problem addressed in this study is the low utilization of the Kertalaya service due to limited access to stations, the lack of optimal feeder transportation, and students’ need for safe, comfortable, afforda…
Construction projects have a high risk of work accidents; therefore, the implementation of the Construction Safety Plan is essential in creating a safe working environment. This study aims to analyze the level of RKK implementation and identify the factors inhibiting its implementation in the Oncology Building construction project at Mohammad Hoesin Hospital Palembang. The study employed a quan…
Construction projects have a high risk of work accidents, making occupational health and safety (OHS) an important aspect in project implementation. This study aims to identify potential hazards, assess risk levels, and determine risk control recommendations in the construction project of the Oncology Building at Mohammad Hoesin Hospital Palembang using the HIRARC (Hazard Identification, Risk A…
Pendahuluan: Kemacetan di Kota Palembang dipicu oleh ketimpangan distribusi aktivitas perkotaan yang masih terpusat pada koridor utama, sementara kawasan timur seperti Kalidoni dan Sako belum berkembang optimal. Keterbatasan kapasitas jalan dan rendahnya kualitas transportasi publik menyebabkan arus perjalanan tetap terkonsentrasi menuju pusat kota. Penelitian ini bertujuan menganalisis restruk…
Portland cement-based mortar possesses a relatively porous microstructure, which may adversely affect its strength and durability. This study aimed to investigate the effect of hydrothermally synthesized fly ash-derived nanosilica on the microstructure and compressive strength of mortar. Nanosilica was synthesized from fly ash using a hydrothermal method. Mortar mixtures were prepared with nano…
This research evaluates the effect of variations in bamboo pile configurations (4x4, 5x5, and 6x6) combined with geosynthetic reinforcements (geogrid and geotextile) on the bearing capacity of foundations on peat soil from Ogan Komering Ilir. The research method uses laboratory-scale static loading tests with data interpretation through the Tangent Intersection and Mazurkiewicz methods. The res…
This research is backgrounded by the delay in the Flyover Gelumbang construction project, which recorded a negative deviation of 5.160% in the 37th week. The primary factors hindering work progress include adverse weather conditions and delays in the supply of materials such as granular, mini piles, and selected embankment. This delay caused the remaining work duration to swell to 112 days from…
This study discusses the implementation of the Building Information Modelling (BIM) method using Autodesk Revit 2026 in the concrete structural works of the Gelumbang Flyover Construction Project. The study aims to determine the results of structural work volume calculations using the BIM method, compare the work volume results between the BIM and conventional methods, and identify the differen…
This study aims to analyze the erosion and sedimentation rates in the paddy fields of PT Buyung Poetra Sembada Tbk and evaluate the erosion level against its permissible tolerance limits. The Universal Soil Loss Equation (USLE) method was employed to estimate soil erosion based on rainfall erosivity, soil erodibility, slope length and steepness, as well as land cover and conservation factors. S…
The drainage system in the Soccer Field area of Sriwijaya University Palembang Campus frequently experiences inundation due to suboptimal drainage performance and the influence of tidal conditions at the outlet connected to the Anak Sekanak River. In addition, field surveys identified several drainage channels affected by sedimentation, covered by soil and leaves, and structural damage in certa…
The Faculty of Engineering, Sriwijaya University Palembang Campus, frequently experiences inundation during high-intensity rainfall due to the suboptimal performance of the drainage system. This study aims to analyze the capacity of the drainage channels in the Faculty of Engineering area by considering the influence of rainfall and tidal conditions. The main issue addressed in this research is…
This research was conducted on the retaining wall work (DPT) at the Air Kembang Sari Bridge Replacement Project in PALI Regency, which has a fairly high level of occupational accident risk. This study aims to identify potential hazards, assess the risk level, and determine risk control measures for Occupational Health and Safety (OHS) using the Hazard Identification, Risk Assessment, and Risk C…
The high number of workplace accidents in the construction sector, particularly in bridge construction projects with high structural complexity and large project scale, highlights the importance of conducting occupational health and safety (OHS) risk analysis. This study was conducted on the Musi V Bridge Construction Project involving segmental box girder work using the balance cantilever meth…
Travel demand in Indralaya District, as the administrative center of Ogan Ilir Regency and an educational hub, continues to increase due to the activities of local community and the academic community of Sriwijaya University. The existing transportation modes have not been able to optimally accommodate this travel demand. Therefore, the government plans to revitalize the Kertapati – Indralaya…
The decline in the water quality of the Penjemuran River is influenced by domestic and livestock activities around the river area, indicated by Biological Oxygen Demand (BOD) and pH parameters that do not meet the Class II water quality standards based on Government Regulation No. 22 of 2021. Therefore, an environmentally friendly and simple water treatment technology is required, one of which …
Flat slab systems in building structures are susceptible to punching shear failure around the column due to high stress concentration. One method to improve the shear capacity of slabs is by using transverse steel reinforcement and additional strengthening materials such as aluminum. This study aims to analyze the punching shear capacity of geopolymer concrete flat slabs strengthened with trans…
This study aims to analyze the reinforcement efficiency of pilecap beams and floor slabs subjected to variations in pump-induced vibration loads in the Karanganyar Pulokerto Pump Intake Structure. The analysis was carried out using ETABS software with the Walking Vibration Analysis method on two types of centrifugal pumps, namely EN 733 and DPV 18-60. The evaluation was based on vertical accele…
TPST (Integrated Waste Processing Facility) is a facility designed to manage waste from multiple sources in an integrated manner through sorting, recycling, composting, and other treatment processes prior to the disposal of residual waste at the Final Disposal Site (TPA). This study aims to quantify waste generation in the selected sub-districts, develop waste transportation route maps using a …
This study aims to evaluate the performance of household waste management in riverbank settlements of Seberang Ulu II District, Palembang City, using the Waste Management Performance Index (IKPS) and spatial analysis based on Geographic Information Systems (GIS). The method employed is a quantitative approach through surveys of waste generation and composition, field observations, and questionn…
Permasalahan sampah di Kabupaten Ogan Ilir, khususnya Kecamatan Indralaya Utara, menunjukkan peningkatan akibat aktivitas domestik dan keterbatasan pengelolaan di TPA Patra Raya yang masih menggunakan metode open dumping. Penelitian ini bertujuan memproyeksikan timbulan sampah tahun 2026–2036, menentukan kebutuhan lahan TPST sesuai Permen PU No. 03/PRT/M/2013, merancang siteplan, serta merenc…
Permasalahan sampah di Kabupaten Ogan Ilir, khususnya Kecamatan Indralaya Utara, menunjukkan peningkatan akibat aktivitas domestik dan keterbatasan pengelolaan di TPA Patra Raya yang masih menggunakan metode open dumping. Penelitian ini bertujuan memproyeksikan timbulan sampah tahun 2026–2036, menentukan kebutuhan lahan TPST sesuai Permen PU No. 03/PRT/M/2013, merancang siteplan, serta merenc…